Where is the metallic floor going?
Metallic Epoxy Flooring South Africa is a decorative floor first and a hard wearing one second. Metallic pigment is worked through a clear resin while it is wet, so the swirl is made on the day and no two floors come out the same. It suits showrooms, shops, reception areas and homes rather than a forklift aisle. Say where it is going and how big it is, and compare priced quotations.
Super easy & fast
- Know what a metallic floor should cost, so you never pay too much.
- Send the same details to several flooring contractors, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that you see a sample board before the floor is poured.
Say where the floor is going, and get metallic epoxy quotes.
Get the Best QuoteMetallic Epoxy Flooring Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Grinding the slab back, per square metre | R45 - R120 |
| Metallic epoxy with a clear top coat, per square metre | R700 - R1,500 |
| Extra clear coat for wear, per square metre | R120 - R280 |
| Urethane top coat against ambering, per square metre | R150 - R320 |
| Sample board in your colours | R450 - R1,500 |
| Levelling a dished slab first, per square metre | R180 - R450 |
| A 40 square metre showroom | R32,000 - R65,000 |
| A 15 square metre entrance | R14,000 - R26,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African industrial flooring rates. They are not our prices or quotations, and no provider is bound by them. Resin flooring is quoted on the FLOOR AREA and on the PREPARATION the slab needs, so confirm what each quotation includes, such as the grinding or shot blasting, the crack and joint repair, any levelling, the primer, the system thickness in millimetres, and what the coving, drains and line marking cost.
What You Are Choosing
- The base colour. The dark ground the metallic is floated over.
- The metallic itself. One pigment or two, and how strongly they are worked.
- The pattern. Soft clouding, strong marbling or a poured ripple.
- The gloss level. High gloss shows the depth, satin hides the footprints.
- The top coat. Clear over the metallic is what takes the wear.
Where It Works and Where It Does Not
- Showrooms and shops. A floor people look at, with foot traffic only.
- Receptions and offices. Where the floor is part of how the room reads.
- Homes. Living areas, entrances and feature rooms.
- Not under forklifts. Point loads and turning tyres mark it.
- Not in direct sun all day. Clear epoxy ambers in ultraviolet light without a urethane top coat.
How the Work Runs on Site
- Grind and repair. The floor is seamless, so every flaw shows through it.
- Agree a sample. A board poured in your colours, because a photograph is not the floor.
- Lay the base. A solid coloured coat the metallic is worked over.
- Pour and move it. The pattern is made wet, with a trowel, roller or air.
- Seal it. One or two clear coats, which is what you walk on.
Get a price for your own room rather than a range.
Get the Best QuoteWhat Affects the Price
- The area. A small room carries the set up cost over fewer square metres.
- The pattern. A strong multi pigment marble takes longer to work than soft clouding.
- The number of clear coats. One is a finish, two is a floor that stays looking new.
- The slab. Every dip and patch reads through a glossy seamless surface.
- The light. A sunlit room wants a urethane top coat rather than clear epoxy.
- Edges and skirtings. Coving, thresholds and step nosings are extra.
What to Include in Your Request
- The address. Suburb and town, so a contractor knows whether they work there.
- The floor area. Square metres, paced out is fine.
- What room it is. Showroom, shop, reception, home or workshop.
- The look you want. A photograph of a finish you like is the best brief there is.
- What is on the floor now. Tiles, screed, old coating or bare concrete.
- How much sun it gets. It decides the top coat.
Before You Appoint a Flooring Contractor
- Ask to see poured work. A metallic floor is made by hand and the hand shows.
- Ask for a sample board. Mixed in your colours, in the room, in daylight.
- Ask what the top coat is. Clear epoxy in strong sun turns yellow over time.
- Ask how many clear coats. The clear takes the wear, not the metallic.
- Ask about repairs. A seamless decorative floor is patched by recoating an area, not a spot.
- Ask how long the room is closed. Several days between coats is normal.
Metallic Epoxy Flooring FAQs
How much does metallic epoxy flooring cost in South Africa?
Commonly R700 to R1,500 a square metre including a clear top coat, with grinding quoted on top at R45 to R120. A 40 square metre showroom usually lands between R32,000 and R65,000, and a small entrance costs more per square metre because the set up is the same.
Will every floor look the same?
No, and that is the point of it. The pattern is made in wet resin on the day, so two floors in the same colours come out differently. Ask for a sample board poured in your colours and look at it in the room, because the pattern reads differently under different light.
Is it hard wearing?
It stands up well to foot traffic and trolleys and badly to point loads and turning wheels. What takes the wear is the clear coat over the metallic, so a second clear coat is the cheapest thing you can add to a floor that will be walked on all day.
Does it go yellow?
Clear epoxy ambers under ultraviolet light, so a floor in strong daylight should be finished with a urethane top coat instead. In an interior room away from direct sun, clear epoxy holds its colour for years.
Can it be repaired?
It is repaired by recoating an area rather than by touching up a spot, because a seamless floor has no joint to stop at. Deep damage usually means grinding back and reworking the bay, which is why the clear coat matters more than people expect.
A decorative floor is bought on the finish and priced on the preparation, and Industrial Epoxy Flooring South Africa is the quickest way to see what both of them cost.
Related Services
Get the Best Quote, Fast
Client Reviews
Powered by leaderr

