How far out is the floor?
Self Levelling Screed South Africa is a cement based topping poured over an uneven slab to give a flat surface for whatever goes on next. It is a preparation product rather than a finished floor, and it is the honest answer when a slab is too far out for a resin system to correct. Say how far out the floor is and how big it is, and compare priced quotations.
Super easy & fast
- Know what levelling a floor should cost, so you never pay too much.
- Send the same details to several flooring contractors, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that the depth is measured rather than estimated.
Say how far out the floor is, and get levelling screed quotes.
Get the Best QuoteSelf Levelling Screed Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Grinding and priming the slab, per square metre | R60 - R150 |
| Levelling screed, up to 5 mm, per square metre | R180 - R320 |
| Levelling screed, 5 to 10 mm, per square metre | R250 - R450 |
| Levelling screed, 10 to 20 mm, per square metre | R350 - R700 |
| Deep fill or a bonded sand cement screed, per square metre | R450 - R900 |
| Level survey of the floor | R1,500 - R6,000 |
| Thresholds and edge trims, per linear metre | R120 - R350 |
| A 150 square metre floor at 8 mm average | R45,000 - R80,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African industrial flooring rates. They are not our prices or quotations, and no provider is bound by them. Resin flooring is quoted on the FLOOR AREA and on the PREPARATION the slab needs, so confirm what each quotation includes, such as the grinding or shot blasting, the crack and joint repair, any levelling, the primer, the system thickness in millimetres, and what the coving, drains and line marking cost.
When a Floor Needs Levelling
- Before a resin floor. Flow applied resin follows the slab, it does not correct it.
- Before vinyl or tiles. A thin covering shows every hollow under it.
- Where water stands. A dished bay that never dries out after a wash down.
- After a slab is lifted. Removing tiles or screed leaves an uneven surface.
- Across a step in level. Where two pours or two rooms meet at different heights.
What Decides the Price
- The average depth. Levelling material is sold by weight and depth is the whole cost.
- How far out the floor is. The deepest point sets the depth across the bay.
- The primer. A slab has to be sealed or it pulls water out of the mix.
- Edge detail. Door thresholds, channels and where the new level stops.
- Access. Pumped or mixed by hand, and how far it has to travel.
How the Work Runs on Site
- Survey the levels. A laser across the floor shows what the eye does not.
- Prepare and prime. Ground, vacuumed and primed so the topping bonds and does not dry out.
- Set the datum. Pins or pegs to the finished level, so flat is a number not a guess.
- Mix and pour. Poured in bands and spike rolled to release air.
- Let it dry. Walkable in hours, ready for a resin floor in days.
Get a price for your own floor rather than a range.
Get the Best QuoteWhat Affects the Price
- Depth. The single biggest cost, and it is set by the lowest point.
- Area. A large open floor pours faster than a set of small rooms.
- What goes on top. A resin floor wants a flatter and drier base than tiles do.
- The existing surface. Old adhesive, paint or screed is removed first.
- Drying time. How long before the next trade, and what that costs you.
- Access. Upper floors and long carries slow the pour down.
What to Include in Your Request
- The address. Suburb and town, so a contractor knows whether they work there.
- The floor area. Square metres, paced out is fine.
- How far out it is. A straight edge and a tape is enough to say roughly.
- What goes on top. Resin, vinyl, tiles or nothing.
- What is on the slab now. Tiles, adhesive, paint, screed or bare concrete.
- Photos. A low angle down the floor, and anywhere water stands.
Before You Appoint a Flooring Contractor
- Ask how the depth was worked out. A level survey, or a look from the doorway.
- Ask about the primer. Skipping it is the usual reason a topping debonds.
- Ask how flat it will be. Flatness is a tolerance, and it should be stated.
- Ask about drying time. A resin floor over a damp topping blisters.
- Ask about thresholds. The floor level changes, and doors may need easing.
- Ask whether it is a finished floor. Levelling compound is a base, not a surface to use bare.
Self Levelling Screed FAQs
How much does a self levelling screed cost in South Africa?
Commonly R180 to R320 a square metre up to 5 mm, R250 to R450 at 5 to 10 mm and R350 to R700 at 10 to 20 mm, with grinding and priming quoted on top. A 150 square metre floor at an 8 mm average usually lands between R45,000 and R80,000.
Is it a finished floor?
No. It is a base for a resin floor, vinyl, tiles or carpet. Left bare it dusts, marks and wears, so if you want the levelled surface itself to be the floor, a resin system or a polish goes over it.
How level does it end up?
Flat to a tolerance the contractor should state, not perfectly level. A levelling topping takes out undulation across a bay; it does not change the fall of a building or correct a floor that slopes by design, and both of those are structural questions.
How deep can it go?
Most levelling compounds work up to around 20 mm in one pour, with deeper areas filled first or a bonded sand cement screed used instead. Depth is also most of the cost, so a survey that finds the real low point is worth the money.
How long before the next floor goes on?
Foot traffic is usually a matter of hours and a resin floor several days, because the topping has to dry rather than merely set. Putting a sealed resin floor over a topping that is still wet traps the water and lifts the new floor off later.
Levelling is the step that decides how the finished floor looks, and Industrial Epoxy Flooring South Africa is the quickest way to see what it costs before the resin is ordered.
Related Services
Get the Best Quote, Fast
Client Reviews
Powered by leaderr

